Material supply planning and management model for social housing projects in a construction company

C. Robles, E. Rangel, N. Sánchez

Abstract


This article addresses the development of a model for the material supply planning and management in the construction industry, using System Dynamics, supported by AHP supplier selection methods, evaluation and monitoring with ABC classification, all mediated by Vensim data analysis software. The supply management in the construction industry is studied and analyzed based on a collaborative model between suppliers and builders, under the CPFR model and the integration of the Last Planner System, which contributes to optimize the use of resources that allow completing all social interest housing (VIS) construction projects. The model simulates the impact and performance produced in the collaborative system, compliance with planning and profitability in VIS projects, appropriate selection, and supplier evaluation and monitoring. Finally, this model allows those who make strategic decisions in VIS projects to identify the most critical variables, assess their contribution, and make the right decisions to eliminate waste due to waiting time.

Keywords


Social Interest Housing (VIS), Construction Company, Supply, Last Planner System, Supplier, Provider, Collaborative Logistics

Full Text:

PDF ENGLISH

DOI: http://dx.doi.org/10.7764/RIC.00025.21

Refbacks

  • There are currently no refbacks.


Copyright (c) 2022 Revista Ingeniería de Construcción

Creative Commons License
This work is licensed under a Creative Commons Attribution 4.0 International License.
Link partner: dewagg luxury12 liveslot168 luck365 kingceme mantap168 koko303 harta138 joker99 gacor77 qq1221 qqdewa qqalfa qqpulsa qq88asia qqslot777 qqnusa slot5000 idngg vegas4d slotsgg gen77 luxury138 idncash qq8821 liga788 ingatbola88 harum4d luxury777 kaisar888 gem188 ligaplay88 laskar138 okeplay777 goyangtoto babetoto asian4d birutoto kong4d kenzototo warungtoto pokerseri autowin88 vegas77 slot gacor